Enterprise Park, Krakow, Poland
Enterprise Park, Krakow, Poland
Construction Date: 4 phases / 6 buildings: 2012, 2014, 2015,2016 2017
Type of work completed:
• Aluprof MB SR50N mullion and transom facades
• Doors and windows in Aluprof MB 70/70US, MB 86/86US systems
• Fire doors and in Yawal TM75 EI systems.External and internal ventilated facades with cladding
• Alucoil Larson aluminium composite panel, Equitone fibre cement panel ( Euronit initially
– Acoustic screens on the technical floors of the roof (in terms of steel structure, aluminum louvers, sandwich panel with mineral wool core)
– Exterior walls in Knauf Aquapanel drywall system along with exterior plaster finish STO Milano
– The works included design, prefabrication and assembly of the structure.